PavingPaisley
1960s terrace house, rear garden with rectangle pegged out with string, a spirit level and a pallet of slabs.
1960s terrace house, rear garden, rectangle pegged out with string

Paving installation
in Paisley

A plain walk-through of what happens on a paving job, from first look to last sweep.

  • Ground checked before anything is dug
  • A stone base built in layers
  • A tidy finish and a clear-up
  • Ground looked at before anything is dug
  • A stone base built in layers
  • Joints filled and levels checked
  • The site swept and cleared
  • Call now to book a look
New-build townhouse front garden with tape measure on the turf and orange marker paint outlining a path.

Stage one: look at the ground

Before we quote, we want to see the plot. How big is it? Where does the rain run? Is the ground firm, soggy or full of builder's rubble? How will materials arrive, and is there room for a skip?

A good first look saves a nasty surprise on day two. It also lets us say what the job needs, rather than guess.

  • Size and shape measured
  • Water flow noted
  • Access and storage planned
1930s semi, back garden with mini-digger lifting soil, compacted crushed stone at one end.

Stage two: dig and build the base

The dig removes turf, old concrete and soft soil, and goes deeper where the ground is bad. Then the stone goes in a few centimetres at a time, each layer pressed down hard so it can't settle later.

  • Spoil lifted until the ground is firm
  • Stone compacted layer by layer
  • Levels and falls checked with a line
Half-laid buff slab patio in a back garden, with a mallet, trowel, bucket and stacked offcuts.

Stage three: lay, joint and tidy

Slabs, stones or blocks are set on a thin bedding layer one at a time and tapped level. Cuts are made on site, joints are filled and the area is swept. Before we leave we walk you round the finished job.

  • Edges finished and held
  • Joints filled and surface checked
  • Site swept and cleared
Cleared back garden before work with pots stacked by the fence, washing line taken down, cones marking a pallet spot beside an open gate.

What you can do beforehand

  • Clear the area. Move pots, furniture and washing lines.
  • Tell us about hidden things. Drains, cables or an old tank.
  • Say where materials can go. A pallet needs a flat spot.
  • Check any rules. See the Renfrewshire notes and ask the council.

Paving installation questions

What happens at the first visit?

We walk the plot, measure, ask what you want and talk through the base and falls.

Can paving go down in winter?

Often, as long as the weather lets mortar and joints set. We'd rather wait a day than lay something that fails.

How long will the job take?

Size, soil and the forecast all play a part. We'll say once we've seen the plot.

What happens to the old surface?

That's the usual plan.

Who arranges a dropped kerb?

Work to the kerb needs written consent from the roads authority, which in Paisley is Renfrewshire Council (Roads (Scotland) Act 1984, section 56; legislation.gov.uk, up to date to 22 November 2026).

Do I have to be out while you work?

Yes. Expect noise from the compactor and some dust on dry days.

Ask for a quote

Give us your postcode and a few lines about the job.

Starred boxes must be filled in. Your phone and postcode let us place the job.

Your message is used only to reply to you. More on the privacy page.

If the form does not send, please call.

Get a quote07700 175069Call now